Crew:
Steven Lindsey [3], Commander
Charles Hobaugh [1], Pilot
Michael Gernhardt [4], Mission Specialist
James Reilly [2], Mission Specialist
Janet Kavandi [3], Mission Specialist
Launch:
Pad: 39-B [47]
Date: 12 July 2001
Time: 09:03:59 UTC
Orbit:
Altitude: 240 nm
Inclination: 51.6 degrees
Orbits: 216
Duration: 12 days, 18 hours, 34 minutes, 56 seconds
Distance: 5,300,000 miles
ISS Docking: PMA-2 on Destiny, 14 July 2001, 03:08 UTC - 22 July 2001, 04:54 UTC
Landing:
Location: Runway 15, Kennedy Space Center, FL [55]
Date: 25 July 2001
Time: 03:38:55 UTC
Rollout: 1 minute, 41 seconds (3,310 meters, 10,858 feet)
Mission EVA's:
1) On 15 July 2001 for 5 hours, 59 minutes
2) On 18 July 2001 for 6 hours, 29 minutes
3) On 21 July 2001 for 4 hours, 2 minutes
EVA's were performed by the following individuals:
Michael Gernhardt
James Reilly
Highlights:
10th Space Station Assembly Flight 7A.
Three spacewalks totalling 16.5 hours were performed for the installation of the joint
airlock assembly.
Mission Poster | Crew | Crew Poster |
Archived NASA mission page for STS-104
Page last modified: 08 April 2024 16:04:12.